Check out the new USENIX Web site. next up previous
Next: PACE Up: Background and Related Work Previous: Interval-based DVS algorithms

Task-based voltage schedulers

Recently, researchers have started building task-based schedulers, i.e., schedulers that consider the work of the system to consist of tasks with certain deadlines. The goal of a task-based scheduler is to use speeds just high enough to meet these deadlines with reasonable probability.

Yao et al. [23] described how to compute an optimal schedule when task CPU requirements and deadlines are known. Hong et al. [6] later showed how to compute such schedules more quickly using various heuristics. However, systems do not generally have definite knowledge of task CPU requirements, so these approaches are unrealistic.

Flautner et al. [4] built a task-based voltage scheduler for Linux. This scheduler requires no modification of applications--it infers all information about the system's tasks via heuristics. It infers that an interactive task begins when a user interface event arrives, and uses a complex work-tracking heuristic to decide when such a task completes. It infers that a periodic task begins when a periodic event occurs; it considers an event periodic if the lengths of intervals between the last $ n$ events have a small variance. To determine the speed for a task, it essentially computes the average of the speeds that would have completed past similar tasks on time. In later work [3], they refined their period detector (but not their task completion detector) to use a simpler heuristic and they extended their interactive performance-setting algorithm with two other policy layers: one for application-specific policies and one for a per-task interval-based policy.

Pillai et al. [19] built a task-based scheduler for real-time embedded systems that runs on Linux. This scheduler assumes complete knowledge of the deadlines and worst-case CPU requirements of all tasks in the system, and assumes these tasks are periodic. The scheduler uses different algorithms, some of which make provisions for tasks completing before their deadlines. One such algorithm slows down the CPU when a task creates slack in the schedule by completing early. Another algorithm anticipates that tasks will likely complete early and therefore starts tasks as slowly as possible and only uses higher speeds when these become necessary to guarantee on-time completion.


next up previous
Next: PACE Up: Background and Related Work Previous: Interval-based DVS algorithms
Jay Lorch 2003-02-19