Bake-off Controversy
Huge set of subtle issues
Different designs optimized for different aspects
which workload
Design versus engineering
eg, Chord has 408 node cache
What sort of churn (joins, leaves)?
What sort of failures?
What scale?
A very healthy process. PlanetLab still way too small.
Previous slide
Next slide
Back to first slide
View graphic version